
Witney, Oxfordshire · OX28
Woodlands Road
Guide price
A large (c. 500 sq ft) first floor apartment with its own garage — an ideal first-time purchase. Sensible outgoings, a share of the freehold, and over 950 years remaining on the lease offer genuine long-term security, while qualifying first-time buyers also benefit from no Stamp Duty to pay. Vacant possession from November.
The home, in the agent’s words
Read the full agent description
THE PROPERTY:
Occupying the first floor of a well-managed residential building set within communal grounds towards the end of one of Witney's more prestigious addresses, this apartment offers something increasingly rare in the leasehold market: a share of the freehold, a peppercorn ground rent, and service charges that reflect sensible management rather than the inflated figures common in newer developments offering little beyond a lift to justify them. The lease extends to over 950 years — for a first-time buyer, that blend of security and low running costs is hard to come by, and is further sweetened by the fact that no Stamp Duty Land Tax is payable by qualifying first-time buyers.
Internally, the apartment totals around 500 square feet (46.5 square metres) and centres on a generous double bedroom with the bathroom conveniently placed alongside. The kitchen has been smartly refitted, with ceramic tiled splashbacks, expansive wood-effect work surfaces, an integrated electric oven and hob, and a practical serving hatch through to the living room. The bathroom retains a deep panelled bath with an independent shower over, with borrowed light entering through a distinctive lozenge-shaped window.
The property further benefits from its own garage, plus access to unallocated residents' parking. Double glazing is fitted throughout, and heating is electric. Currently let until the end of October, the apartment will then be offered with immediate vacant possession — a straightforward timeline for a buyer looking to move without delay.
A well-proportioned, low-maintenance home with genuinely long-term security of tenure, in one of Witney's best-regarded settings.
Agent's Note: images are taken from our archive and show the property before the current tenancy.
Outgoings: Ground Rent £0; Service Charge £1,200.00 per annum, payable in two instalments on 1 October and 1 April each year.
West Oxfordshire District Council – Tax Band B
A feel for the area
Connected for everyday life
100%of homes in the postcode can access 100+ Mbps broadband.
Available speed bands
- 30+ Mbps
- 100%
- 100+ Mbps
- 100%
- 300+ Mbps
- 100%
- 1,000+ Mbps
- 100%
Getting about
4.2 milesto Finstock Rail Station
Approximate straight-line distance · DfT NaPTAN · 13 Sept 2026Background air quality
- Fine particles · PM₂.₅
- 6.7 µg/m³ · Above the WHO guideline · well within the UK legal limit
- Nitrogen dioxide · NO₂
- 6.3 µg/m³ · Meets the WHO guideline
Annual background levels. For scale: the WHO 2021 guideline is 5 µg/m³ for PM₂.₅ and 10 for NO₂; the UK legal limit is 20 and 40. Lower is better; this is a 1 km model, not a reading at the door.
Defra · 2024 annual model · 1 km areaLocal information is approximate. Distances are straight-line estimates from the available location. Broadband describes postcode coverage, not the speed or service available at this home; check the address with a provider. Air quality is a modelled annual background estimate.
Picture your everyday
Start with the agent's details and explore the area guide to get a feel for daily life here.
Other homes nearby
Homes in OX28 postcode area →About these property details
The information provided in this listing is for general information purposes only and does not constitute property particulars. We make no warranties or guarantees, express or implied, regarding the accuracy, completeness, or availability of the information.
Property details are provided by the listing agent, developer, or other third parties, and we have no control over the content provided. Prospective buyers or tenants should make their own enquiries and verify all information directly with the agent or relevant party.
Information relating to Energy Performance Certificates, Home Reports, or other statutory documents should be obtained directly from the selling agent or developer where applicable.
