Deeside, Flintshire · CH5

Halkyn View, Connah's Quay

£250,000For saleFreehold

Offers over

Agent's summary

NO ONWARD CHAIN | SPACIOUS THROUGHOUT | DETATCHED GARAGE AND AMPLE STORAGE SHEDS | GREAT LOCATION

We are delighted to offer for sale this well-presented and spacious three-bedroom detached bungalow, available with the added benefit of no onward chain. Ideal for those looking to downsize without compromising on space, the property occupies a popular residential location, conveniently situated close to the Quay Shopping Centre, local primary and secondary schools, and within easy walking distance of Wepre Park.

Offering versatile and well-proportioned accommodation throughout, the property briefly comprises an entrance porch, a spacious living room, inner hallway, fitted kitchen, wet room, three bedrooms, and an extended conservatory overlooking the rear garden.

Externally, the property benefits from a large patterned concrete driveway providing ample off-road parking for several vehicles, together with a larger-than-average detached garage fitted with an electric roller door.…

Beds3
Baths1
Receptions2
TypeBungalow
View EPC
From William Gleave Sales & Lettings

The home, in the agent’s words

Read the full agent description

NO ONWARD CHAIN | SPACIOUS THROUGHOUT | DETATCHED GARAGE AND AMPLE STORAGE SHEDS | GREAT LOCATION

We are delighted to offer for sale this well-presented and spacious three-bedroom detached bungalow, available with the added benefit of no onward chain. Ideal for those looking to downsize without compromising on space, the property occupies a popular residential location, conveniently situated close to the Quay Shopping Centre, local primary and secondary schools, and within easy walking distance of Wepre Park.

Offering versatile and well-proportioned accommodation throughout, the property briefly comprises an entrance porch, a spacious living room, inner hallway, fitted kitchen, wet room, three bedrooms, and an extended conservatory overlooking the rear garden.

Externally, the property benefits from a large patterned concrete driveway providing ample off-road parking for several vehicles, together with a larger-than-average detached garage fitted with an electric roller door. To the rear is a generous enclosed garden featuring a patterned concrete patio area, an additional paved seating area, and a lawn bordered by a variety of established flowers, trees, and shrubs. The garden also benefits from several useful storage sheds and gated access to the front of the property from both sides.

An early viewing is essential to appreciate everything it has to offer

View EPC

A feel for the area

Connected for everyday life

100%

of homes in the postcode can access 100+ Mbps broadband.

Available speed bands
30+ Mbps
100%
100+ Mbps
100%
300+ Mbps
100%
1,000+ Mbps
100%
Ofcom · Jan 2026 · postcode CH5 4NB · residential premises

Getting about

1.2 miles

to Shotton Rail Station

Approximate straight-line distance · DfT NaPTAN · 13 Sept 2026

Background air quality

Fine particles · PM₂.₅
5.7 µg/m³ · Above the WHO guideline · well within the UK legal limit
Nitrogen dioxide · NO₂
6.0 µg/m³ · Meets the WHO guideline

Annual background levels. For scale: the WHO 2021 guideline is 5 µg/m³ for PM₂.₅ and 10 for NO₂; the UK legal limit is 20 and 40. Lower is better; this is a 1 km model, not a reading at the door.

Defra · 2024 annual model · 1 km area

Local information is approximate. Distances are straight-line estimates from the available location. Broadband describes postcode coverage, not the speed or service available at this home; check the address with a provider. Air quality is a modelled annual background estimate.

Checking nearby places…

Find a life, not a listing

Picture your everyday

Start with the agent's details and explore the area guide to get a feel for daily life here.

About these property details

The information provided in this listing is for general information purposes only and does not constitute property particulars. We make no warranties or guarantees, express or implied, regarding the accuracy, completeness, or availability of the information.

Property details are provided by the listing agent, developer, or other third parties, and we have no control over the content provided. Prospective buyers or tenants should make their own enquiries and verify all information directly with the agent or relevant party.

Information relating to Energy Performance Certificates, Home Reports, or other statutory documents should be obtained directly from the selling agent or developer where applicable.