
Loggerheads · TF9
Acorn Close, Loggerheads
Acorn Close, Loggerheads, TF9
In Excess of · Originally listed at £300,000
Charming two-bedroom bungalow in Loggerheads with spacious living areas, conservatory, garden, garage, no upward chain, and easy access to local amenities. Book a viewing today.
The home, in the agent’s words
- No Upward Chain – Move forward with ease and enjoy a potentially smoother purchase process.
- Spacious Two-Bedroom Bungalow – Well-proportioned accommodation with both bedrooms overlooking the rear garden.
- Bright Conservatory & Generous Living Room – Two excellent reception spaces ideal for relaxing and entertaining.
- Private Garden, Driveway & Integral Garage – Enjoy attractive outdoor space alongside ample off-road parking.
- Popular Village Location – Situated in Loggerheads, close to local amenities, bus routes, primary schooling and excellent links to surrounding market towns.
Read the full agent description
Welcome to 13 Acorn Close, a delightful two-bedroom bungalow nestled in the heart of the ever-popular village of Loggerheads. Just like the humble acorn that grows into something truly special, this charming home offers plenty of potential, comfort and character, all wrapped up in a wonderfully convenient location. Better still, the property is offered to the market with no upward chain, helping your move take root as smoothly as possible.
Step through the front door and into a welcoming entrance hall, the perfect starting point for your journey through this lovely home. Wood-effect flooring stretches beneath your feet, creating a warm and cohesive feel as it flows seamlessly into the spacious living room. From here, you'll find access to the kitchen, living accommodation and handy storage spaces tucked away like hidden treasures beneath an old oak tree. The kitchen is a well-equipped hub of the home, offering an abundance of cabinetry paired with complementary wood-effect work surfaces. Whether you're rustling up a quick breakfast or preparing a feast worthy of a woodland gathering, you'll appreciate the range of integrated appliances, including a CDA oven and microwave, all designed to make everyday living a breeze. Branching off from the kitchen is a bright and airy conservatory, bathed in natural light and providing an additional reception space to enjoy throughout the seasons. With lovely views across the garden, it's the ideal spot for a morning coffee, a good book, or simply watching the changing colours of the outdoors. The living room is a particularly generous reception space, offering plenty of room to relax and unwind. A feature fireplace creates a cosy focal point, while a large front-facing window allows natural light to pour in, making the room feel bright and inviting all year round. From the living room, the home continues to unfold. A side porch provides convenient access to both the garden and the integral garage, while an inner hallway leads to the two bedrooms and bathroom.
Both bedrooms are positioned peacefully at the rear of the property, overlooking the garden and providing space for double beds and additional furnishings. Fresh grey carpeting lies underfoot, while crisp white walls throughout the home offer a blank canvas ready for your own personal style to take root and flourish. The bathroom is fitted with a shower, WC, sink vanity unit and a contemporary stainless-steel towel radiator. Finished with white tiling, it offers a clean and practical space for everyday routines. One feature you'll quickly discover throughout the property is the abundance of built-in storage. From cupboards to cleverly utilised spaces, there's plenty of room to squirrel away belongings and keep your home neat and organised.
Outside, the garden is a real acorn gem. Offering generous areas of lawn, patio seating spaces and a variety of established plants, trees and shrubs, it's a wonderful setting for gardening enthusiasts or anyone looking to create their own outdoor sanctuary. Whether you're planting new ideas or simply enjoying the sunshine, this garden provides plenty of space to grow. To the front, a driveway and integral garage provide seamless off-road parking, ensuring practicality accompanies the property's charm.
Situated within the sought-after village of Loggerheads, residents enjoy easy access to local amenities, bus routes and a primary school. For a wider selection of shopping, dining and leisure facilities, the market towns of Market Drayton and Eccleshall, along with Newcastle-under-Lyme, are all just a short drive away.
Like the acorn in its name, 13 Acorn Close is full of promise, offering comfortable single-storey living, wonderful outdoor space, no upward chain, and the opportunity to put down roots in a thriving village community. Give us a call today to book a viewing - 01785 851886.
A feel for the area
Connected for everyday life
100%of homes in the postcode can access 100+ Mbps broadband.
Available speed bands
- 30+ Mbps
- 100%
- 100+ Mbps
- 100%
- 300+ Mbps
- 100%
- 1,000+ Mbps
- 100%
Getting about
9.1 milesto Norton Bridge Rail Station
Approximate straight-line distance · DfT NaPTAN · 13 Sept 2026Background air quality
- Fine particles · PM₂.₅
- 5.8 µg/m³ · Above the WHO guideline · well within the UK legal limit
- Nitrogen dioxide · NO₂
- 4.2 µg/m³ · Meets the WHO guideline
Annual background levels. For scale: the WHO 2021 guideline is 5 µg/m³ for PM₂.₅ and 10 for NO₂; the UK legal limit is 20 and 40. Lower is better; this is a 1 km model, not a reading at the door.
Defra · 2024 annual model · 1 km areaLocal information is approximate. Distances are straight-line estimates from the available location. Broadband describes postcode coverage, not the speed or service available at this home; check the address with a provider. Air quality is a modelled annual background estimate.
Picture your everyday
Start with the agent's details and explore the area guide to get a feel for daily life here.
Other homes nearby
Homes in TF9 postcode area →About these property details
The information provided in this listing is for general information purposes only and does not constitute property particulars. We make no warranties or guarantees, express or implied, regarding the accuracy, completeness, or availability of the information.
Property details are provided by the listing agent, developer, or other third parties, and we have no control over the content provided. Prospective buyers or tenants should make their own enquiries and verify all information directly with the agent or relevant party.
Information relating to Energy Performance Certificates, Home Reports, or other statutory documents should be obtained directly from the selling agent or developer where applicable.
